Top 10 Pre-Bid Projects in Alberta - October 2025

Top 10 Pre-Bid Projects in Alberta - October 2025

The top 10 pre-bid projects in Alberta by project value as of October 6, 2025. Click through on any project below to get more information or follow these links to search all projects in our database across and the .

Pathways Alliance - Foundational CCS Project

Site work for a mixed-use development in Cold Lake, Alberta. Design plans call for site work for a pipeline; and power facility. Construction of a 400-kilometre liquid CO2 transportation line that could eventually link over 20 CCS facilities with a carbon storage hub in northeast Alberta. The network is expected to have the capacity to transport captured CO2 from over 20 oil sands facilities in Fort McMurray region to a joint carbon storage hub in the Cold Lake Region.

Project Value (CAD): $16,500,000,000

Building Use: Pipeline, Power Plant

Sector: Private

Project Type: Site Work

Location: Multiple Locations, Cold Lake, AB

Project Stage: Design

Multiple Locations, Cold Lake, AB

Moraine Power Generation Project

Site work for a mixed-use development in Whitecourt, Alberta. Design plans call for site work for a power facility; and pipeline. Construction of a 465-megawatt gas-fired power facility approx. 10 kilometres west of Whitecourt that will include CO2 capture and a pipeline to an underground storage hub. The facility will be fueled by sweet natural gas via a 30 km pipeline from the NGTL Windfall Meter Station to the power generation facility.

Project Value (CAD): $10,000,000,000

Building Use: Pipeline, Power Plant

Sector: Private

Project Type: Site Work

Location: AB-32 & AB-43, Whitecourt, AB

Project Stage: Design

AB-32 & AB-43, Whitecourt, AB

Fort Saskatchewan Clean Hydrogen Project

Site work and new construction of a mixed-use development in Fort Saskatchewan, Alberta. Working plans call for the construction of a industrial development; and pipeline. Canada’s largest clean hydrogen project, expected to produce more than 300,000 tonnes per year of clean hydrogen using advanced technology to capture more than 90% of the emissions generation in the hydrogen production process. Approximately 65% of the produced clean hydrogen would be used in refining processes and cogeneration of steam and electricity at the Suncor Edmonton Refinery, reducing refinery emissions by up to 60%.

Project Value (CAD): $5,000,000,000

Building Use: Pipeline, Industrial

Sector: Private

Project Type: Site Work

Location: To Be Determined, Fort Saskatchewan, AB

Project Stage: Pre-Construction

To Be Determined, Fort Saskatchewan, AB

Metro Line NW LRT Expansion - Phase Two (Blatchford to Castle Downs)

Site work and new construction of a mixed-use development in Edmonton, Alberta. Design plans call for site work for a transportation facility; bridge / tunnel; for the construction of a transportation facility; and bridge / tunnel. Second phase of the Metro Line LRT NW Expansion project (Blatchford to Campbell Road). Project will include a new 10km extension from Blatchford; including a 650-metre long, 75-metre tall, cable-stayed bridge, stretching across Yellowhead Trail and the adjacent CN Walker yard before touching down on 113A Street. Project will include construction of an operations and maintenance facility, seven (7) stations, and two transit centres and the decommissioning of the current NAIT station, and delivery of new stations at NAIT and in Blatchford.

Project Value (CAD): $1,800,000,000

Building Use: Bridges/Tunnels, Transportation Terminals

Sector: Public – City

Project Type: Site Work

Location: Multiple Locations, Edmonton, AB

Project Stage: Design

Multiple Locations, Edmonton, AB

Truman - Stampede Station Mixed-Use Development

Site work and new construction of a mixed-use development in Calgary, Alberta. Design plans call for the construction of a 1,476,227-square-foot, 71-story above grade, 418-unit multi-residential development; 413-room hospitality development; retail development; and restaurant. Plans call for a mixed-use development to include two towers, 71-storeys and 63-storey in height; approx. 418 residential dwelling units and 413 hotel rooms.

Project Value (CAD): $1,470,000,000

Building Use: Multi-Residential, Restaurant, Retail, Hotel/Motel

Sector: Private

Project Type: Site Work

Location: 232 15 Ave SE, Calgary, AB

Project Stage: Design

232 15 Ave SE, Calgary, AB

Future Energy Park - Carbon Negative RNG and Ethanol Project

Site work and new construction of an industrial development in Calgary, Alberta. Working plans call for the construction of a industrial development. Construction of a net CO2 negative biofuels plant that will use non-food grade wheat to produce RNG and ethanol. The facility is expected to produce over 3.5 millon MMBtu/year of RNG, 300 million litres/year of ethanol, approx. 235,000 tonnes of high-quality protein distillers grain, capture 400,000 tonnes of clean CO2 and create carbon credits. Other related work to include construction of a 28.8 MW cogeneration plant to supply power & steam to the facility.

Project Value (CAD): $1,200,000,000

Building Use: Industrial

Sector: Private

Project Type: Site Work

Location: 4920 68 St NE, Calgary, AB

Project Stage: Pre-Construction

4920 68 St NE, Calgary, AB

eStruxture CAL-3 facility

Site work and new construction of a data center facility in Rocky View County, Alberta. Working plans call for the construction of a 150,000-square-foot, two-story above grade data center facility. Construction of a 90-megawatt data centre.

Project Value (CAD): $750,000,000

Building Use: Data Centers

Sector: Private

Project Type: Site Work

Location: Highway 566, Rocky View County, AB

Project Stage: Pre-Construction

Highway 566, Rocky View County, AB

Homestead Solar Project 1

Site work and new construction of a power facility in Claresholm, Alberta. Working plans call for site work for a power facility; and for the construction of a power facility. Construction of a 400MW solar energy facility to be located approx. 11 kilometres southeast of Claresholm. The power plant will consist of approx. 1,100,000 Longi LR5-72HBD-545M bifacial solar photovoltaic modules on a single-axis tracking system, 100 4600-UP-US inverters and underground collector lines that would connect to the Homestead 1111S Substation.

Project Value (CAD): $725,000,000

Building Use: Solar Power Generation

Sector: Private

Project Type: Site Work

Location: Range Rd 254, Claresholm, AB

Project Stage: Pre-Construction

Range Rd 254, Claresholm, AB

Luna Solar+ Project

Site work and new construction of a power facility in Duchess, Alberta. Working plans call for site work for a power facility; and for the construction of a power facility. Construction of a solar power generation facility with a total capacity of 930MW, and a 16MW/320 MWh battery energy storage system (BESS). The project will be located approx. 20 km west of Brooks, in Newell County. Work will consist of road work, installation of up to 2.2 million solar PV modules (ground-mounted, bifacial), 260 inverter/transformer stations, and a 34.5kV underground collection system to be connected to the AIES through an existing 240kV transmission line.

Project Value (CAD): $700,000,000

Building Use: Solar Power Generation

Sector: Private

Project Type: Site Work

Location: To Be Determined, Duchess, AB

Project Stage: Pre-Construction

To Be Determined, Duchess, AB

CVW Horizon Project - Titanium and Zircon Extraction Facility

Site work and new construction of an industrial development in Fort Chipewyan, Alberta. Working plans call for the construction of a industrial development. Construction of a Titanium and Zircon Extraction Plant at Canadian Natural Horizon’s oil sands site. Utilizing CVW (Titanium Corporation’s Creating Value from Waste) technology, the facility would produce titanium and zircon from the materials left over from bitumen production.

Project Value (CAD): $610,000,000

Building Use: Industrial

Sector: Private

Project Type: Site Work

Location: CNRL Horizon Hwy, Fort Chipewyan, AB

Project Stage: Pre-Construction

CNRL Horizon Hwy, Fort Chipewyan, AB