Top 10 Pre-Bid Projects in Eastern Canada - October 2025

Top 10 Pre-Bid Projects in Eastern Canada - October 2025

The top 10 pre-bid projects in Eastern Canada, ranked by project value as of October 20, 2025.

Click through on any project below for more project intelligence, or click these pages and search projects across using your own criteria.

Canadian Project Search

U.S. Project Search

EverWind Green Hydrogen & Ammonia Plant - Burin Peninsula

Site work and new construction of a mixed-use development in Marystown, Newfoundland. Working plans call for the construction of a power facility; and power facility. Construction of a green hydrogen production facility. Scope of work includes construction of a 2 – 3 GW wind farm to produce green hydrogen and ammonia on the southern portion of the Burin Peninsula, south of Marystown. Approx. 350 – 450 turbines will be installed.

Project Value (CAD): $16,000,000,000

Building Use: Power Plant, Wind Power Generation

Sector: Private

Project Type: Site Work

Location: NL-220, Marystown, NL

Project Stage: Pre-Construction

NL-220, Marystown, NL

EverWind Green Hydrogen & Ammonia Plant - Point Tupper

Site work and new construction of a mixed-use development in Port Hood, Nova Scotia. Working plans call for the construction of a power facility. Construction of a green hydrogen production facility at the former Nustar Energy transshipment terminal in Point Tupper, NS. Phase 1 of the project will include conversion of the terminal to turn wind energy purchased from NS Power into hydrogen (set to produce approx. 240,000 tonnes/year of green ammonnia). Phase 2 will include addition of onshore wind farm to expand production (2+ GW).

Project Value (CAD): $8,000,000,000

Building Use: Power Plant, Wind Power Generation

Sector: Private

Project Type: Site Work

Location: Port Malcolm Rd, Port Hood, NS

Project Stage: Pre-Construction

Port Malcolm Rd, Port Hood, NS

Bear Head Energy Project

Site work and new construction of a mixed-use development in Point Tupper, Nova Scotia. Working plans call for site work for a industrial development; and pipeline. Construction of a large-scale hydrogen & ammonia production, storage and loading facility for domestic and export markets. The project is permitted for up to two gigawatts of hydrogen electrolysers. At full build-out and peak power inflow, it could produce up to 350,000 tonnes of hydrogen and two million tonnes of ammonia per year.

Project Value (CAD): $4,000,000,000

Building Use: Pipeline, Industrial

Sector: Private

Project Type: Site Work

Location: To Be Determined, Point Tupper, NS

Project Stage: Final Planning

To Be Determined, Point Tupper, NS

Mactaquac Generating Station Upgrades

Site work for a power facility in Keswick Ridge, New Brunswick. Design plans call for site work for a power facility. Upgrades and repairs to the 660-MW power generation station to ensure that it will be able to operate to its intended 100-year lifespan until 2068 through equipment maintenance and replacement. The scope of the project includes the replacement of six turbine in the powerhouse and an expense of $100-million for upgrades for fish passage.

Project Value (CAD): $3,000,000,000

Building Use: Power Plant

Sector: Public – State/Provincial

Project Type: Site Work

Location: Keswick Ridge, NB

Project Stage: Design

Keswick Ridge, NB

Kamistuatusset Iron Ore Project (Kami Iron Ore Project)

Site work for a mixed-use development in North West River, Newfoundland. Design plans call for site work for a industrial development; and road / highway. Construction of an iron ore mine in western Labrador (south of Labrador City & Wabush) with a capacity of 16 million metric tonnes of iron ore concentrate transported via existing rail lines to the Pointe-Noire Terminal at the Port of Sept-ÃŽles, Quebec. Main feature of the project are construction of the primary crusher building; the ore processing plant (concentrator); a raw water pump-house located SE of Long Lake; the Nalcor Power transmission line & main electrical substation; tailings management facility; construction of mine roads; the mines serves area consisting of a vehicle wash bay, mine garage workshop, warehouse, a diesel fuel tank farm & fueling station.

Project Value (CAD): $982,000,000

Building Use: Roads/Highways, Industrial

Sector: Private

Project Type: Site Work

Location: Multiple Locations, North West River, NL

Project Stage: Design

Multiple Locations, North West River, NL

West End Mall - Mixed-Use Development (Master Plan)

Site work and new construction of a mixed-use development in Halifax, Nova Scotia. Design plans call for the construction of a 4,428,442-square-foot, 25-story above grade, 5,564-unit multi-residential development; retail development; restaurant; and parking garage. Construction of a high-density development , with a mix of commercial and residential use at the West End Mall (Mumford & Chebucto Roads, and Joseph Howe Drive). Project will be a major redevelopment of the Halifax Shopping Centre Annex – the shopping mall property bounding by the CN Rail, Mumford Road and Leppert Street.

Project Value (CAD): $916,500,000

Building Use: Multi-Residential, Parking Garage, Restaurant, Retail

Sector: Private

Project Type: Site Work

Location: 7020 Mumford Rd, Halifax, NS

Project Stage: Design

7020 Mumford Rd, Halifax, NS

Windy Ridge Power Project

Site work and new construction of a power facility in Debert, Nova Scotia. Working plans call for the construction of a power facility. Construction of a 340MW wind power project to be located in the Municipality of Colchester County. The facility will include up to 50 Nordex N163 7.0MW turbines be and will be connected to the Nova Scotia Grid 345kV line, by way of a transmission line linking the Project substation to this 345kV line.

Project Value (CAD): $660,000,000

Building Use: Wind Power Generation

Sector: Private

Project Type: Site Work

Location: NS-4, Debert, NS

Project Stage: Pre-Construction

NS-4, Debert, NS

Sisson Mine Project

Site work for an industrial development in Napadogan, New Brunswick. Working plans call for site work for a industrial development. Construction of an open pit tungsten and molybdenum mine and the associated processing, storage, waste treatment and disposal facilities. Project mine life is expected to be 27 years, with 20,000 tonnes of ore processed per day. Scope of work also includes: construction of the work also includes upgrades to surrounding access roads and construction of new roads within the project site. The Sisson property is located approx. 100 kilometres northwest of the City of Fredericton.

Project Value (CAD): $579,000,000

Building Use: Industrial

Sector: Private

Project Type: Site Work

Location: NB-107, Napadogan, NB

Project Stage: Pre-Construction

NB-107, Napadogan, NB

Belledune Phosphoric Acid Manufacturing Facility

Site work and new construction of a manufacturing facility in Belledune, New Brunswick. Design plans call for the construction of a manufacturing facility; and for site work for a manufacturing facility. Construction of a phosphoric acid plant that will require a yearly supply of sulfuric acid, water and apatite from the Lac a Paul mine. The plant will produce 500,000 tonnes of phosphoric acid, along with by-product gypsum.

Project Value (CAD): $330,000,000

Building Use: Manufacturing

Sector: Private

Project Type: Site Work

Location: To Be Determined, Belledune, NB

Project Stage: Design

To Be Determined, Belledune, NB

101 Research Drive - Multi-Residential Development

Site work and new construction of a multi-residential development in Dartmouth, Nova Scotia. Design plans call for the construction of a nine-story above grade, 1,040-unit multi-residential development. Plans call for a new multi-residential development to include ten (10) multi-unit apartment buildings, ranging from 3 to 9 storeys. The development site is also known as the Southdale lands.

Project Value (CAD): $224,400,000

Building Use: Multi-Residential

Sector: Private

Project Type: Site Work

Location: 101 Research Dr, Dartmouth, NS

Project Stage: Design

101 Research Dr, Dartmouth, NS