Surrey’s $60M Fleetwood Reservoir project wraps up, mural unveiled
Surrey’s $60M Fleetwood Reservoir project wraps up, mural unveiled
SURREY, B.C. — Work has wrapped up on theÌý$60 million Fleetwood ReservoirÌýproject, a piece of drinking water infrastructure in Surrey, B.C., Metro Vancouver reports. The reservoir, located at Meagan Anne MacDougall Park, also features a new mural by q̓ʷɑ...